Linear's sprint-planning is human-authored and human-scored. R&D Workforce flips both: the AI composes each engineer's day-to-day to-do list from project context, role, and outstanding work, and the AI measures completion against evidence (commits, PRs, issue updates, time logs, doc edits). Two KPIs come out: (1) time logged meets the required time budget, and (2) progress meets the AI-designed daily list. Linear's shape is retained (teams · cycles · tasks · workflow states) because engineers like it — but the planning-and-scoring loop is AI-driven, not human-driven. If you're on Linear today, we import your workspace and you cancel Linear. Ongoing coexistence is not offered — the whole point is you stop paying for Linear and stop doing sprint grooming.
Same layout as Linear's cycle view. Grouped by workflow state; sortable by any column.
Everything Linear has, plus the dashed panel — the Workforce-only fields.
#1912 Add consent_state enum + migration#1913 Block record until first explicit accept
Sub-issues (4): 2.1 Reproduce · 2.2 Backend enum · 2.3 Frontend block · 2.4 Compliance review.
We don't run alongside Linear. The goal is that you stop paying Linear. The switch is designed to fit in a single weekend, with an optional 14-day read-only sync as a safety net during handover.
The 14-day sync is one-way (Linear → Workforce read-only) and time-boxed. We do not offer permanent two-way coexistence — that would defeat the "cancel Linear" outcome and split the team's attention across two tools. Subscribers who have never used Linear skip this section entirely.
Full workspace import (teams, cycles, projects, tasks, subtasks, labels, comments, workflow history, PR links). Cutover Saturday; 14-day one-way read-only sync as safety net; cancel Linear at day 15. Not permanent coexistence — the switch is the whole point.
Workforce provisions the workspace, seeds a starter team + cycle, engineer signs T0 access, first task is ready in minutes. Linear never enters the flow.